Sign In | Join Free | My burrillandco.com
Home > Pipe Shrinking Machine >

11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine

Zhangjiagang Hengli Technology Co.,Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine from wholesalers
     
    Buy cheap 11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine from wholesalers
    • Buy cheap 11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine from wholesalers
    • Buy cheap 11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine from wholesalers

    11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine

    Ask Lasest Price
    Brand Name : Xingyu
    Certification : ISO9001-2000
    Model Number : G800
    Delivery Time : 60days
    Payment Terms : 30%advanced payment by TT,70% before shipment
    Supply Ability : 20 per month
    • Product Details
    • Company Profile

    11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine


    11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine


    G400 shrinking machine for making pipe before done in drawing machine


    Quick Detail:


    1. Type: pipe-shrinking machine

    2. Model Number: G800

    3. Used in: G800 pipe-shrinking machine is for making pipe before drawing machine,the material can be any metal.G400 pipe-shrinking machinecan roll pipe diameter of 16--40mm to 10--35mm.


    The technical parameters:


    Operating Instructions:


    No.NameTechnical ParametersUnit
    1Range of Reduction
    for Diameter
    10 ~ 35mm
    2Diameter of Mother Tube16 ~ 40mm
    3Time for
    one reduction
    4 ~ 6s
    4Motor11kw
    5System pressure52Mpa
    6Machine Size900*1150*1310mm
    7Machine weight1750kg

    G400 pipe-shrinking machine operations and processes


    1. Take out the mould by rotating it according to arrow direction, no reverse rotation allowed.

    2. Moulds can be changed according to different specifications.

    3. Head length can be adjusted by middle adjusting rod, loose the belt wheel screw, adjust the length and fasted the screw again.

    4. Pour in 80% diesel and 20% engine oil, as the oil pump capacity is big, oil box entrance valve should be fully open, machine valve fix a little oil is ok.

    5. After the umbrella-block wear down and the gap becomes big, you can put a gasket between umbrella block and the mould, but the gasket can not be too thick so that machine won't get stuck.

    6. The lubrication oil should be changed after it gets dirty.


    Safety Precautions


    1,Place the machine on a fixed horizontal surface and the calibration level, the machine is stable.

    2,Check the oil level before use, to keep the hydraulic oil target position in 1/2 or more.

    3,Check the motor rotation, such as rotation error, please adjust the power wiring.

    4,When the state machine automatically, please confirm the accuracy of the input data.

    5,When the machine is operating, safety, the hands, the body, such as near the action area is prohibited.

    6,People must be dedicated machine operation, and the operator should be able to reach and stand within the scope of the emergency stop button.

    7,Machine must be grounded.

    8,When remove mold, must turn off the power.

    9,Please refuel oil regularly.

    10,Keep the machine and the environment clean.

    11,Not allowed to work in the dust, conductive particles and acids and other places.


    Factory picture:


    Part of the machine:

    Quality 11KW Automatic Shrink Wrap Machine , Heat Shrink Tubing Machine for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Zhangjiagang Hengli Technology Co.,Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)